A final layer of asphalt will be added to the entire length after the second phase is complete.ĭuring the construction, Huron River Drive (HRD) from Main Street to Bird Road will be closed to traffic. Main to about halfway to Bird Road, and the second will be late-May 2009 to September 2009 and will cover the remaining stretch between the 2008 construction and Bird Road. Construction is planned in two phases: the first will be May 2008 to early-September 2008 and will go from N. Main Street and Bird Road is planned for 20. Major work on Huron River Drive between N. Bus routes affected include AATA Route 7.Ĭonstruction of a roundabout and adding a traffic signal, through mid-June 2008. Traffic detoured along Ann Arbor Saline Road and Eisenhower. Reconstruction of the intersection, April 28 to May 23. Historical road work South Main and Eisenhower, near Briarwood Washtenaw County Road Commission: Current road and bridge closuresĬity of Ann Arbor: Road or lane closures, including event detoursĬity of Ann Arbor: Lane closure map (Google maps) shows road work
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |